Site execution

From trench to handover.

A predictable, repeatable build sequence — the same precision on every site, whether one home or a thousand units.

Steps of construction

Follow the build,
from ground to home.

Scroll through the real site sequence—from excavation and interlocking masonry to the composite slab, finishing and handover.

01

Foundation excavation

The trench is excavated before lean concrete is laid, levelled and checked.

Excavated foundation trench with lean concrete
02

Plinth and reinforcement

The plinth band is laid, vertical reinforcements rise from below, and compacted earth forms the floor base.

Plinth band, reinforcement and compacted earth
03

First brick course

The first course of Nutan interlocking masonry is aligned precisely above the plinth.

First interlocking brick course above plinth
04

Walls to sill level

Courses rise to sill level, defining door openings around the vertical reinforcement.

Interlocking masonry built to sill level
05

Lintel preparation

Wall masonry reaches lintel level and shuttering is prepared for the continuous lintel band.

Wall masonry and lintel shuttering
06

Walls to floor level

Interlocking walls are completed to receive the floor or roof system.

Interlocking walls completed to floor level
07

Lightweight lifting

Precast components are lifted by light crane—or manually with a chain pulley where access is limited.

Precast component lifted by light crane
08

Joists and planks

Prabal joists sit on bed blocks while planks are placed across and aligned.

Prabal joists and planks being placed
09

Roof reinforcement

Steel is bound across the roof band and plank haunches before the slab is closed.

Steel binding for roof band and slab
10

Haunch concreting

Concrete fills the haunches to lock the precast roof components together.

Concrete filling of roof haunches
11

Composite slab complete

The finished structural slab creates a monolithic roof ready for the next level.

Completed composite slab
12

Upper-floor walling

The same repeatable masonry sequence continues cleanly on the first floor.

First-floor interlocking wall construction
13

Finishing begins

Openings, services and external surfaces are prepared for final architectural finishes.

Building under finishing
14

Completed row

The completed homes demonstrate the speed and consistency of the full system.

Completed row of homes
15

Interior handover

Finished interiors are ready for occupation, with conventional fixtures and finishes.

Completed interior finishing
Lifting & handling

Light enough to handle anywhere.

Components are sized for easy handling — placed by light crane where access allows, or by chain pulley and hand where it doesn't. No heavy industrial plant required.

⌂

1st floor & beyond

The same sequence repeats upward — walling, joists, planks — for multi-storey row housing and apartments.

✦

Finishing

Plaster, railings, doors, windows and services bring each unit to a clean, move-in-ready standard.

▦

Vendor ecosystem

A managed supply chain for steel, waterproofing, doors, plumbing, electricals and finishes keeps delivery predictable.

Interior finishing
The result

A finished home,
built to last.

Clean interiors, durable structure, and a 50+ year design life — delivered on a fraction of the conventional timeline.